This chapter gives the basic procedures to be followed for grading projects and the PIAs. The objective of grading is to lay a firm foundation to encourage good PIAs and to motivate other PIAs to improve. Projects will be graded on four parameters:
i) Physical infrastructure quality
ii) Batch training quality
iii) Placement quality and
vi) Project execution quality.
Detailed marking on each of the parameter is given in SF 9.1A: Overall marking pattern for a project.
Grading will facilitate comparison of a project and its sub components with other projects. It will also facilitate comparison of performance of PIAs - within a state and across different states.
Grading will be based on objective measures using data captured in various information systems and also by on-site inspections. The details are given for each parameter separately.
All projects will be graded continuously by capturing data from the data reporting mechanism as specified in SOP and/or ASDMS. Result will be reported every month giving the grade for the month and cumulative up to the end of the month.The grades arrived at the end of financial year (end of March) both for the year and cumulative - i.e. from project start to the end of the year; will be reported as yearly gradings. Similarly gradings will also be calculated on half yearly basis (April 1st to 30thSeptember and 1st October to 31st March) will be reported as half yearly gradings. The half year and annual gradings will be frozen and used to assess the relative performance across projects. The complete mechanism for calculation will be given in ASDMS.
9.1.1 Methodology of marking and grading
Sl.No |
Parameter |
Time of assessment |
Validity* |
Reference |
1 |
Physical Infrastructure |
At the time of due diligence |
2 years. However if there is deterioration |
Section 9.2 |
2 |
Batch Training Quality |
Continuous Process |
Based on continuous flow |
Section 9.3 |
3 |
Placement Quality |
Continuous Process |
Section 9.4 |
|
4 |
Project Execution Quality |
Continuous Process |
Section 9.5 |
|
5 |
Overall Grading of a Project |
Half yearly |
|
Section 9.6 |
Note*: Time is indicative. However MoRD/NIRD&PR are at liberty to order fresh assessment anytime as per exigencies. |
9.1.2 Grading Teams and other personnel involved
Teams and personnel involved in grading will be as follows:
The detailed composition and duties of each team is given in SF 9.1B:Composition and duties of teams and personnel involved in assessment and grading.
9.2.1 Grading of physical infrastructure of a training centre without residential facilities
Overview
Item |
Description |
Purpose |
To grade a training centre without residential facilities on basis of its physical infrastructure |
Prerequisite/s |
Successful completion of due diligence procedure |
Time for completion |
Due-diligence +17 working days |
Resource/s |
SF 9.2A: Assessment of physical infrastructure after due diligence |
Process owner |
For APS: SRLM For YPS: CTSA |
Activities
Sl. No. |
Action |
Actor |
Time for completion |
Relevant documents |
For YPS |
||||
1 |
Assessment after due diligence |
CTSA |
Due diligence + 10 days |
SF 9.2A: Assessment of physical infrastructure after due diligence |
2 |
Review by PIA of the assessment |
PIA |
Due diligence + 15 days |
Review and validate SF 9.2A |
3 |
Validation of the assessment |
CTSA |
Due diligence + 17 days |
Validate and freeze SF 9.2A |
For APS |
||||
1 |
Assessment after due diligence |
SRLM |
Due diligence + 10 days |
SF 9.2A: Assessment of physical infrastructure after due diligence |
2 |
Review by PIA of the assessment |
PIA |
Due diligence + 15 days |
Review and validate SF 9.2A |
3 |
Validation of the assessment |
SRLM |
Due diligence + 17 days |
Validate and freeze SF 9.2A |
9.2.2 Grading of physical infrastructure of training centre with residential facilities
Overview
Item |
Description |
Purpose |
To grade a training centre on basis of its physical infrastructure with residential facilities |
Prerequisite/s |
Successful completion of due diligence procedure |
Time for completion |
Due diligence +17 working days |
Resource/s |
SF 9.2B: Assessment of physical infrastructure after due diligence |
Process owner |
For APS: SRLM For YPS: CTSA |
Activities
Sl. No. |
Action |
Actor |
Time for completion |
Relevant documents |
For YPS |
||||
1 |
Assessment after due diligence |
CTSA |
Due diligence + 10 days |
SF 9.2B: Assessment of physical infrastructure after due diligence |
2 |
Review by PIA of the assessment |
PIA |
Due diligence + 15 days |
Review and validate SF 9.2B |
3 |
Validation of the assessment |
CTSA |
Due diligence + 17 days |
Validate and freeze SF 9.2B |
For APS |
||||
1 |
Assessment after due diligence |
SRLM |
Due diligence + 10 days |
SF 9.2B: Assessment of physical infrastructure after due diligence |
2 |
Review by PIA of the assessment |
PIA |
Due diligence + 15 days |
Review and validate SF 9.2B |
3 |
Validation of the assessment |
SRLM |
Due diligence + 17 days |
Validate and freeze SF 9.2B |
9.2.3 Resolving differences during assessment
In case of difference of opinion in the assessment team during due diligence, NIRD&PR will take the final decision and grading will be done accordingly. To enable this the due diligence team should reproduce sufficient evidence to the national assessment team. The evidence could be written documents, photographs and videos but it should be authenticated by the team.
However a PIA can file an appeal to MoRD. MoRD should give its decision within 20 working days and that will be treated as binding. However, if MoRD does not give decision in 20 days, then the decision taken by NIRD&PR will be considered final.
Overview
Item |
Description |
Purpose |
To grade quality of training given to a batch |
Prerequisite/s |
Completion of a batch |
Time for completion |
Completion of Training of a batch + 15 working days |
Resource/s |
|
Process owner |
For APS: SRLM For YPS: CTSA |
Activities
Sl. No. |
Action |
Actor |
Time for completion |
Relevant documents |
For YPS |
||||
1 |
Conduct the assessment of the training quality |
CTSA |
Completion of batch+15 working days |
|
2 |
Review by PIA of the assessment |
PIA |
Verification of training quality of a batch by CTSA+30 days |
Review and validate SF 9.3A |
3 |
Validation of the assessment |
CTSA |
Verification of Placement of a batch by CTSA+35 days |
Validate and freeze SF 9.3A |
For APS |
||||
1 |
Conduct the assessment of the training quality |
SRLM |
Completion of batch+15 working days |
|
2 |
Review by PIA of the assessment |
PIA |
Verification of Placement of a batch by SRLM+30 days |
Review and validate SF 9.3A |
3 |
Validation of the assessment |
SRLM |
Verification of Placement of a batch by SRLM+35 days |
Validate and freeze SF 9.3A |
Overview
Item |
Description |
Purpose |
To grade the placement quality achieved in a project |
Prerequisite/s |
Completion of monthly physical placement verification process |
Time for completion |
Continuous process |
Resource/s |
|
Process owner |
For APS: SRLM For YPS: CTSA |
Activities
Sl. No. |
Action |
Actor |
Time for completion |
Relevant documents |
For YPS |
||||
1 |
Assess the quality of placements |
CTSA |
Monthly Verification of Placement of a batch by CTSA+20 days |
|
2 |
Review by PIA of the assessment |
PIA |
Monthly Verification of Placement of a batch by CTSA+30 days |
Review and validate SF 9.4A |
3 |
Validation of the assessment |
CTSA |
Monthly Verification of Placement of a batch by CTSA+35 days |
Validate and freeze SF 9.4A |
For APS |
||||
1 |
Assess the quality of Placements |
SRLM |
Monthly Verification of Placement of a batch by SRLM+20 days |
|
2 |
Review by PIA of the assessment |
PIA |
Monthly Verification of Placement of a batch by SRLM+30 days |
Review and validate SF 9.4A |
3 |
Validation of the assessment |
SRLM |
Monthly Verification of Placement of a batch by SRLM+35 days |
Validate and freeze SF 9.4A |
Overview
Item |
Description |
Purpose |
To grade a project on its execution quality |
Prerequisite/s |
Completion of one year of execution phase |
Time for completion |
Meeting of Prerequisite + half yearly assessment (September and March) |
Resource/s |
|
Process owner |
For APS: SRLM For YPS: CTSA |
Activities
Sl. No. |
Action |
Actor |
Time for completion |
Relevant documents |
For YPS |
||||
1 |
Conduct the grading of a project on its execution quality |
CTSA |
half yearly +15 days |
|
2 |
Review by PIA of the assessment |
PIA |
half yearly +20 days |
Review and validate SF 9.5A |
3 |
Validation of the assessment |
CTSA |
half yearly +25 days |
Validate and freeze SF 9.5A |
For APS |
||||
1 |
Conduct the grading of a project on its execution quality |
SRLM |
half yearly +15 days |
|
2 |
Review by PIA of the assessment |
PIA |
half yearly +20 days |
Review and validate SF 9.5A |
3 |
Validation of the assessment |
SRLM |
half yearly +25 days |
Validate and freeze SF 9.5A |
Overview
Item |
Description |
Purpose |
To calculate the aggregate score for overall grading of a project |
Prerequisite/s |
Freezing of grades of training centre |
Time for completion |
Meeting of Prerequisite + half yearly assessment (September and March) |
Resource/s |
|
Process owner |
For APS: NIRD&PR For YPS: NIRD&PR |
Activities
Sl. No. |
Action |
Actor |
Time for completion |
Relevant documents |
For YPS |
||||
1 |
Calculate the aggregate score of the training centre and grade the project |
NIRD&PR |
half yearly +25 days |
SF 9.6A & SF 9.6B: Grading of PIAs on all parameters across all sanctioned projects and Grading of Projects across all projects and PIAs |
2 |
Review by PIA of the assessment |
PIA |
half yearly +30 days |
|
3 |
Validation of the assessment |
NIRD&PR |
half yearly +35 days |
|
For APS |
||||
1 |
Calculate the aggregate score of the training centre and grade the project |
NIRD&PR |
half yearly +25 days |
SF 9.6A & SF 9.6B: Grading of PIAs on all parameters across all sanctioned projects and Grading of Projects across all projects and PIAs |
2 |
Review by PIA of the assessment |
PIA |
half yearly +30 days |
|
3 |
Validation of the assessment |
NIRD&PR |
half yearly +35 days |
9.7.1 Assessment of relative performance of PIAs
Overview
Item |
Description |
Purpose |
To compare performance of the PIAs |
Prerequisite/s |
Successful grading of a PIA across all the projects sanctioned |
Time for completion |
Continuous process |
Resource/s |
SF 9.7A:Assessment of relative performance of PIAs across all the PIAs |
Process owner |
For APS: NIRD&PR For YPS: NIRD&PR |
Activities
Sl. No. |
Action |
Actor |
Time for completion |
Relevant documents |
For YPS |
||||
1 |
Comparison of PIAs performance on basis of their grades |
NIRD&PR |
Yearly+40 days |
SF 9.7A:Assessment of relative performance of PIAs across all the PIAs |
For APS |
||||
1 |
Comparison of PIAs performance on basis of their grades |
NIRD&PR |
Yearly+40 days |
SF 9.7A:Assessment of relative performance of PIAs across all the PIAs |
9.7.2 Assessment of relative performance of PIA in a state and across states
Overview
Item |
Description |
Purpose |
To compare performance of the PIA – Statewise |
Prerequisite/s |
Successful grading of a PIA across all the projects sanctioned |
Time for completion |
Continuous process |
Resource/s |
SF 9.7B: Assessment of relative performance of PIAs across all states |
Process owner |
For APS: NIRD&PR For YPS: NIRD&PR |
Activities
Sl. No. |
Action |
Actor |
Time for completion |
Relevant documents |
For YPS |
||||
1 |
Comparison of PIAs performance on basis of their grades |
NIRD&PR |
Yearly+40 days |
SF 9.7B: Assessment of relative performance of PIAs across all states |
For APS |
||||
1 |
Comparison of PIAs performance on basis of their grades |
NIRD&PR |
Yearly+40 days |
SF 9.7B: Assessment of relative performance of PIAs across all states |
SF 9.1A: Overall marking pattern for a project
SF 9.1B: Composition and duties of teams and personnel involved in assessment and grading
SF 9.2A: Assessment of physical infrastructure of a training centre without residential facilities
SF 9.2B: Assessment of centre level infrastructure of a training centre with residential facilities
SF 9.3A: Grading of batch training quality
SF 9.4A: Grading of placement quality of a project
SF 9.5A: Grading of project execution quality
SF 9.6A: Grading of PIAs on all parameters across all sanctioned projects
SF 9.6B: Grading of Projects across all projects and PIAs
SF 9.7A Comparison of projects across PIAs
SF 9.7B Assessment of relative performance of PIAs in a state across states