Overview
Item |
Description |
Purpose |
To ensure that all the DDU-GKY training centres across India have distinctive look |
Reference to Guidelines |
|
Prerequisite/s |
After signing of MoU and locating training centre. |
Time for completion |
As per training plan |
Resource/s |
SF 5.1A1: Look and feel of a training centre, SF 5.1A2: Training centre name board, SF 5.1A3: Hostel centre name board, SF 5.1B1: Activity summary and achievement board, SF 5.1B2: Contact details of important people, SF 5.1B3: Basic Information Board (Training Centre), SF 5.1B4: Basic Information Board (Residential Centre), SF 5.1B5: Academic Information Board, SF 5.1B6: Living Area Information Board, SF 5.1B7: Code of conduct for candidates, SF 5.1B8: Food menu (residential centre), SF 5.1C1: Student entitlement board and responsibilities board, SF 5.1C1 A: Student Attendance and Entitlement Summary Information Board |
Process owner |
PIA OP team |
Activities
Overview
Item |
Description |
Purpose |
To verify availability of minimum infrastructure before a training centre opens |
Reference to Guidelines |
|
Prerequisite/s |
Signing of MoU. Training, however, can only start after PER approval. |
Time for completion |
Due diligence is required before:
|
Resources/s |
SF 5.1D1: Due diligence of training centre (excluding residential facilities), SF 5.1D2: Due diligence of residential facilities and all the forms mentioned in SF 5.1D1 and SF 5.1D2, SF 5.1S: Bare minimum items to be ensured to start training pending CTSA/ SRLM due diligence visit |
Process owner |
CTSA for YPS/SRLM for APS |
Activities
Actor |
Action |
Time for completion |
Relevant documents |
PIA OP Team |
|
As per training plan |
SF 5.1D1: Due diligence of training centre (excluding residential facilities), SF 5.1D2: Due diligence of residential facilities SF 5.1S: Bare minimum items to be ensured to start training pending CTSA/ SRLM due diligence visit |
PIA Q team |
As per training plan |
||
For APS |
|||
SRLM |
|
Within 10 working days of receipt of information from PIA Q team If the above is not possible due diligence should be done within 20 working days of start of training. Delaying it will impact the performance grading of the SRLM |
|
CTSA |
|
As per inspection schedule |
|
For YPS |
|||
CTSA |
|
Within 10 working days of receipt of information from PIA Q team If the above is not possible it should be done within 20 working days of start of training Delaying it will impact the performance grading of the CTSA. |
To know more about Due Diligence to watch the video
Overview
Item |
Description |
Purpose |
To lay down procedures for opening and running hybrid training centres. |
Reference to guidelines |
No specific reference |
Prerequisite/s |
Any time after signing of MoU |
Time for completion |
As per due diligence process |
Resource/s |
|
Process owner |
SRLM for APS/CTSA for anYPS |
Activities
Actor |
Action |
Time for completion |
Relevant Documents |
||
PIA OP team |
To ensure the following: |
As per training plan |
|||
PIA Q team |
|
As per training plan |
|||
For APS |
|||||
SRLM |
|
As per due diligence process |
|||
For YPS |
|||||
CTSA |
|
As per due diligence process |
|||
Overview
Item |
Description |
Purpose |
To lay down procedures for introducing multiple shifts and double shift batches in a centre. |
Reference to guidelines |
No specific reference |
Prerequisite/s |
Training centres where due diligence is approved |
Time for completion |
5 working days in advance of commencement of training |
Resource/s |
|
Process owner |
PIA OP team |
Activities
Actor |
Action |
Time for completion |
Relevant Documents |
||
PIA OP team |
|
As per training plan at the centre |
|||
PIA Q team |
|
At least 5 working days in advance of commencement of training |
|||
For APS |
|||||
SRLM |
|
As per the inspection schedule |
|||
For YPS |
|||||
CTSA |
|
As per the inspection schedule |
|||
If a PIA plans to introduce multiple shifts and/or double shift batches in a training centre at the time of due diligence all the timelines prescribed in due diligence will be applicable. |
|||||
Overview
Item |
Description |
Purpose |
To ensure proper functioning of training centre and capture details of non-functional equipment, trainer and trainee attendance, and deviations if any from the notified training plan |
Reference to Guidelines |
No specific reference |
Prerequisite/s |
Filing due diligence report by PIA Q team |
Time for completion |
On all days when the trainings are scheduled in the centre |
Resource/s |
SF 5.1T: Daily failure items report and SF 5.1U: 15 day summary of centre status |
Process owner |
PIA OP team |
Activities
Actor |
Action |
Time for completion |
Relevant documents |
PIA OP team |
|
Daily when the centre opens Summarise by 16th of the month for first fortnight and by 1st of next month for the second fortnight and the complete month |
Daily report as per SF 5.1T: Daily failure items report Summary as per |
PIA Q team |
i) daily entry of data and ii) trend of failures
|
Fortnightly and monthly review As per the inspection schedule |
SF 5.1T and |
For APS |
|||
SRLM |
|
Fortnightly and monthly review As per the inspection schedule |
SF 5.1T and |
CTSA |
|
Fortnightly and monthly review As per the inspection schedule |
|
For YPS |
|||
CTSA |
|
Fortnightly and monthly review As per the inspection schedule |
SF 5.1T and |
Overview
Activities
Actor |
Action |
Time for completion |
Relevant documents |
PIA OP team |
To ensure
|
Duration varies as per each activity and time for completion is shown against the activity |
SF 5.2A: Training centre inspection and as per forms listed in due diligence list. |
PIA Q team |
carry out the inspection as detailed in SF 5.2A Share inspection report and advisories with SRLM/CTSA Follow up for compliance |
As per the inspection schedule |
SF 5.2A |
For APS |
|||
SRLM |
|
As per the inspection schedule Within 3 days of conduct of inspection |
SF 5.2A |
CTSA |
|
As per the inspection schedule
Within 3 days of conduct of inspection |
SF 5.2A |
PIA OP team |
|
Within 5 days of receipt of advisories |
SF 5.2A |
PIA Q team |
|
Within 8 days of receipt of advisories | SF 5.2A |
SRLM |
|
As per the schedule prescribed in Default chapter | SF 5.2A |
For YPS |
|||
CTSA |
|
As per the inspection schedule but not later than 3 days of inspection conducted
Within 3 days of conduct of inspection |
SF 5.2A |
All training centres will be inspected by persons trained in DDU-GKY processes. In emergencies if inspections are done by SRLM/CTSA/MoRD personnel not trained in DDU-GKY processes the same should be reviewed and ratified by personnel trained in DDU-GKY.
(If the centre does not run throughout the year, the number of inspections will be reduced proportionately but there should be at least one inspection by Q team in a year).
Content of the section is deleted, however the section is retained to maintain the number continuity
SRLM in an YPS can play an active role in ensuring quality of the programme. However, as SRLM team is not strengthened no schedules are prescribed for their inspections. Depending on the staff availability, SRLM is encouraged to get its personnel trained in DDU-GKY procedures and to enable monitoring by its team.
All inspection reports of SRLM of YPS should be sent to CTSA, PIA and MoRD. It is the responsibility of the PIA to comply with items and send a compliance report through the PIA Q team to SRLM and CTSA. CTSA will monitor and ensure proper compliance.
Overview
Item |
Description |
Purpose |
To ensure that a training centre performs as per procedures in guidelines and the SOP by review of CCTV footage |
Reference to Guidelines |
|
Prerequisite/s |
Start of training centre |
Time for completion |
Continuous process when the training is going on |
Resource/s |
As per SF 5.2B: CCTV - Specifications, location and recording, review and storage |
Process owner |
PIA OP team |
Activities
Actor |
Action |
Time for completion |
Relevant documents |
PIA OP team |
|
Daily |
SF 5.2B: CCTV - Specifications, location and recording, review and storage |
To review CCTV footage as per the instruction given in SF 5.2A: Training centre inspection |
As per the inspection schedule |
||
For APS |
|||
SRLM |
|
As per the inspection schedule |
|
CTSA |
Check on Q team and SRLM reports |
As per the inspection schedule |
|
For YPS |
|||
CTSA |
|
As per the inspection schedule |
To know more about Centre Inspections to watch the video
Overview
Item |
Description |
Reference to guidelines |
|
Prerequisite |
Freezing of batch |
Purpose |
To generate a distinct identity and a sense oneness amongst the candidates |
Time for completion |
To be distributed with the welcome kit |
Resources |
As per SF 5.3A:Specifications for uniform and SF 5.1K: Checklist of items given to candidates |
Process owner |
PIA OP team |
Activities
Actor |
Action |
Time for completion |
Relevant documents |
PIA op team |
|
Measurements: At the time of batch freezing Distribution: Along with welcome kit |
|
PIA Q team |
|
As per the inspection schedule |
|
For APS |
|||
SRLM |
|
As per the inspection schedule |
|
CTSA |
Check on Q team and SRLM reports |
|
|
For YPS |
|||
CTSA |
|
As per the inspection schedule |
This section is deleted and moved to section 4.7: Outline of assessment and certification in Chapter 4.
Earlier sections prescribe checks to be done by an SRLM/CTSA within the state geographical boundaries. In a project while the prospective candidates should be residents of the state to which the project is sanctioned, the training of the candidates can be imparted anywhere in the country. The following steps should be followed if a training centre is outside the state to which the project is assigned:
Agency to monitor the training would be as follows:
SF 5.1A1: Look and feel of a training centre
SF 5.1A2: Training centre name board
SF 5.1A3: Hostel centre name board
SF 5.1B1: Activity summary and achievement board
SF 5.1B2: Contact details of important people
SF 5.1B3: Basic Information Board (Training Centre)
SF 5.1B4: Basic Information Board (Residential Centre)
SF 5.1B5: Academic Information Board
SF 5.1B6: Living Area Information Board
SF 5.1B7: Code of conduct for candidates
SF 5.1B8: Food specifications (residential centre)
SF 5.1C1: Student entitlement board and responsibilities board
SF 5.1C1A: Student Attendance and To and Fro Entitlement Summary Information Board
SF 5.1C2: Welcome kit to trainees
SF 5.1 D1: Due diligence of a training centre (excluding residential facilities)
SF 5.1D2: Due diligence for residential facilities
SF 5.1E1: Summary of staff deployed at the training centre
SF 5.1F: Candidate ID template
SF 5.1G1: Index of individual candidate dossier
SF 5.1G2: Parents’ consent form
SF 5.1H1: Batch summary as on day of batch freezing
SF 5.1H2: List of candidates in the batch and their profile
SF 5.1I: Attendance registers for candidates (as per biometric device)
SF 5.1J: Attendance registers for trainers (as per biometric device)
SF 5.1K: Checklist of items given to candidates
SF 5.1L1: Candidate feedback form
SF 5.1M: Summary of evaluation and assessment done
SF 5.1N: TA/ DA calculation record (batch wise) – To be linked with biometric attendance
SF 5.1O1: Training certificate
SF 5.1O2: Training completion certificate distribution record
SF 5.1P: List of equipment in the training centre
SF 5.1S: Bare minimum items to be ensured to start training pending CTSA/ SRLM due diligence visit
SF 5.1T: Daily failure items report
SF 5.1U: 15 day summary of centre status