5.1. Opening of a training centre

5.1.1 Look and feel of a training centre

Overview

Item

Description

Purpose

To ensure that all the DDU-GKY training centres across India have distinctive look

Reference to Guidelines

Para 3.2.2.2.1, page 27

Prerequisite/s

After signing of MoU and locating training centre.

Time for completion

As per training plan

Resource/s

SF 5.1A1: Look and feel of a training centre, SF 5.1A2: Training centre name board, SF 5.1A3: Hostel centre name board, SF 5.1B1: Activity summary and achievement board, SF 5.1B2: Contact details of important people, SF 5.1B3: Basic Information Board (Training Centre), SF 5.1B4: Basic Information Board (Residential Centre), SF 5.1B5: Academic Information Board, SF 5.1B6: Living Area Information Board, SF 5.1B7: Code of conduct for candidates, SF 5.1B8: Food menu (residential centre), SF 5.1C1: Student entitlement board and responsibilities board, SF 5.1C1 A: Student Attendance and Entitlement Summary Information Board

Process owner

PIA OP team

Activities

Actor

Action

Time for completion

Relevant documents

PIA op Team

To ensure that the training centre conforms to DDU-GKY standards on furniture, layout, and colour scheme

As per training plan

SF 5.1A1: Look and feel of a training centre, SF 5.1A2: Training centre name board, SF 5.1A3: Hostel centre name board, SF 5.1B1: Activity summary and achievement board, SF 5.1B2: Contact details of important people, SF 5.1B3: Basic Information Board (Training Centre), SF 5.1B4: Basic Information Board (Residential Centre), SF 5.1B5: Academic Information Board, SF 5.1B6: Living Area Information Board, SF 5.1B7: Code of conduct for candidates, SF 5.1B8: Food menu (residential centre), SF 5.1C1: Student entitlement board and responsibilities board, SF 5.1C1 A: Student Attendance and Entitlement Summary Information Board

PIA Q team

To ensure that the training centre conforms to DDU-GKY standards on furniture, layout, and colour scheme

At the time of due diligence, as per 5.1.3

SF5.1A1, SF5.1A2, SF5.1A3, SF5.1B1, SF5.1B2, SF5.1B3, SF5.1B4, SF5.1B5, SF5.1B6, SF5.1B7, SF5.1B8, SF5.1C1,

SF5.1C1 A

For APS

SRLM

To ensure that the training centre conforms to DDU-GKY standards on furniture, layout, and colour scheme

At the time of due diligence, as per 5.1.3

SF5.1A1, SF5.1A2, SF5.1A3, SF5.1B1, SF5.1B2, SF5.1B3, SF5.1B4, SF5.1B5, SF5.1B6, SF5.1B7, SF5.1B8, SF5.1C1,

SF5.1C1 A

CTSA

Check on Q team and SRLM reports

As per inspection schedule

SF5.1A1, SF5.1A2, SF5.1A3, SF5.1B1, SF5.1B2, SF5.1B3, SF5.1B4, SF5.1B5, SF5.1B6, SF5.1B7, SF5.1B8, SF5.1C1,

SF5.1C1 A

For YPS

CTSA

  • To ensure that the training centre conforms to DDU-GKY standards on furniture, layout, and colour scheme.
  • Check on Q team reports and also follow up on compliance of SRLM’s observations.

At the time of due diligence, as per 5.1.3

SF5.1A1, SF5.1A2, SF5.1A3, SF5.1B1, SF5.1B2, SF5.1B3, SF5.1B4, SF5.1B5, SF5.1B6, SF5.1B7, SF5.1B8, SF5.1C1,

SF5.1C1 A

5.1.2 Due diligence before opening of a training centre

Overview

Item

Description

Purpose

To verify availability of minimum infrastructure before a training centre opens

Reference to Guidelines

Para 3.2.2.2.1, page 27

Prerequisite/s

Signing of MoU.

Training, however, can only start after PER approval.

Time for completion

Due diligence is required before:

  • opening of a training centre
  • increasing single shift capacity of a training centre above that approved in due diligence,
  • addition of a new trade/domain in training centre
  • converting a DDU-GKY centre into a hybrid centre

Resources/s

SF 5.1D1: Due diligence of training centre (excluding residential facilities), SF 5.1D2: Due diligence of residential facilities and all the forms mentioned in SF 5.1D1 and SF 5.1D2,

SF 5.1S: Bare minimum items to be ensured to start training pending CTSA/ SRLM due diligence visit

Process owner

CTSA for YPS/SRLM for APS

Activities

Actor

Action

Time for completion

Relevant documents

PIA OP Team

  • To ensure that the centre is as per SF 5.1D1 and SF 5.1D2 at training centre
  • To revise the due diligence in case PIA Q team/ SRLM/ CTSA points out deficiencies/incompleteness
  • Permitted to start training if CTSA/SRLM visit does not happen in 10 working days of approval of due diligence by PIA Q team.

As per training plan

SF 5.1D1: Due diligence of training centre (excluding residential facilities), SF 5.1D2: Due diligence of residential facilities

SF 5.1S: Bare minimum items to be ensured to start training pending CTSA/ SRLM due diligence visit

PIA Q team

  • To check and certify particulars of SF 5.1D1 and SF 5.1D2 at training centre
  • To upload results from the due diligence onto a designated web site

As per training plan

SF 5.1D1 and SF 5.1D2

For APS

SRLM

  • Check on Q team’s report

  • To upload results from the due diligence onto a designated web site

Within 10 working days of receipt of information from PIA Q team

If the above is not possible due diligence should be done within 20 working days of start of training. Delaying it will impact the performance grading of the SRLM

SF 5.1D1, SF 5.1D2 and SF 5.1S

CTSA

  • Check on Q team and SRLM reports
  • To upload results from the due diligence onto a designated web site

As per inspection schedule

SF 5.1D1, SF 5.1D2 and SF 5.1S

For YPS

CTSA

  • Check on Q team’s report
  • To upload results from the due diligence onto a designated web site
  • Follow up compliance of SRLM observations

Within 10 working days of receipt of information from PIA Q team

If the above is not possible it should be done within 20 working days of start of training Delaying it will impact the performance grading of the CTSA.

SF 5.1D1, SF 5.1D2 and SF 5.1S

To know more about Due Diligence to watch the video

5.1.3 Opening and Managing of Hybrid[1]training centres

Overview

Item

Description

Purpose

To lay down procedures for opening and running hybrid training centres.

Reference to guidelines

No specific reference

Prerequisite/s

Any time after signing of MoU

Time for completion

As per due diligence process

Resource/s

SF 5.1R: Instructions for opening and running hybrid training centres and introducing multiple shifts and double shift batches in a training centre

Process owner

SRLM for APS/CTSA for anYPS

Activities

Actor

Action

Time for completion

Relevant Documents

PIA OP team

To ensure the following:

  • New centre: ensure compliance to SF 5.1R in addition to those specified in due diligence.
  • Existing DDU-GKY centre: Suggest changes and ensure compliance to SF 5.1R in addition to those specified in due diligence.

As per training plan

SF 5.1D1, SF 5.1D2

SF 5.1R: Instructions for opening and running hybrid training centres and introducing multiple shifts and double shift batches in a training centre

PIA Q team

  • To follow due diligence process
  • To verify the capacity of the training centre as per plan for hybrid centre.

As per training plan

SF 5.1D1, SF 5.1D2

SF 5.1R

For APS

SRLM

  • To follow due diligence process and certify the centre capacity

As per due diligence process

SF 5.1D1, SF 5.1D2

SF 5.1R

For YPS

CTSA

  • To follow due diligence process and certify the centre capacity

As per due diligence process

SF 5.1D1, SF 5.1D2

SF 5.1R

5.1.4 Introduction and running of multiple shifts and Double shift batches[2] in a centre

Overview

Item

Description

Purpose

To lay down procedures for introducing multiple shifts and double shift batches in a centre.

Reference to guidelines

No specific reference

Prerequisite/s

Training centres where due diligence is approved

Time for completion

5 working days in advance of commencement of training

Resource/s

SF 5.1R: Instructions for opening and running hybrid training centres and introducing multiple shifts and double shift batches in a training centre

Process owner

PIA OP team

Activities

Actor

Action

Time for completion

Relevant Documents

PIA OP team

  • To communicate their plan for running multiple shifts or double shift batches
  • To verify the capacity of the training centre to accommodate the multiple shifts or double shift batches

As per training plan at the centre

SF5.1D1, SF 5.1D2,

SF 5.1R: Instructions for opening and running hybrid training centres and introducing multiple shifts and double shift batches in a training centre

PIA Q team

  • To verify the capacity of the training centre to accommodate the multiple shifts or double shift batches

At least 5 working days in advance of commencement of training

SF5.1D1,

SF 5.1D2

SF 5.1R

For APS

SRLM

  • To certify the submitted information at the time of centre inspection

As per the inspection schedule

SF5.1D1,

SF 5.1D2

SF 5.1R

For YPS

CTSA

  • To certify the submitted information at the time of centre inspection

As per the inspection schedule

SF5.1D1,

SF 5.1D2

SF 5.1R

If a PIA plans to introduce multiple shifts and/or double shift batches in a training centre at the time of due diligence all the timelines prescribed in due diligence will be applicable.

5.1.5 Daily monitoring of the training centres

Overview

Item

Description

Purpose

To ensure proper functioning of training centre and capture details of non-functional equipment, trainer and trainee attendance, and deviations if any from the notified training plan

Reference to Guidelines

No specific reference

Prerequisite/s

Filing due diligence report by PIA Q team

Time for completion

On all days when the trainings are scheduled in the centre

Resource/s

SF 5.1T: Daily failure items report and SF 5.1U: 15 day summary of centre status

Process owner

PIA OP team

Activities

Actor

Action

Time for completion

Relevant documents

PIA OP team

  • To check and report on non-functional training equipment, and trainee and trainer attendance and upload the results on the designated web-link
  • Summarise data for 15 days and upload results on the designated web-link

Daily when the centre opens

Summarise by 16th of the month for first fortnight and by 1st of next month for the second fortnight and the complete month

Daily report as per SF 5.1T: Daily failure items report

Summary as per

SF 5.1U: 15 day summary of centre status

PIA Q team

  • Checks from HQs on

i) daily entry of data and

ii) trend of failures

  • On the day of inspection of the centre
    • Check the accuracy of data reported with the actual condition on the day of inspection.
    • Verify from the candidates the accuracy of data reported for a random day (to be picked by the system from last 6 working days).
    • To analyse the results and match with reported data.

Fortnightly and monthly review

As per the inspection schedule

SF 5.1T and

SF 5.1U

For APS

SRLM

  • Checks from HQs on i) daily entry of data and ii) trend of failures
  • Same functions under taken by Q team above
  • To verify randomly generated samples verified by PIA Q team including the inspection notes and compliance to the PIAs Q team observations.

Fortnightly and monthly review

As per the inspection schedule

SF 5.1T and

SF 5.1U

CTSA

  • Checks from HQs on i) daily entry of data and ii) trend of failures
  • Check on Q team and SRLM reports

Fortnightly and monthly review

As per the inspection schedule

For YPS

CTSA

  • Checks from HQs on i) daily entry of data and ii) trend of failures
  • Same functions under taken by Q team above
  • To verify randomly generated samples verified by PIA Q team including the inspection notes and compliance to the PIAs Q team observations.
  • Follow up on SRLM’s observations

Fortnightly and monthly review

As per the inspection schedule

SF 5.1T and

SF 5.1U



[1] See SF 5.1R for definition of a hybrid centre

[2] For definitions see SF 5.1R

5.2. Inspection of training centre

Overview

Item

Description

Purpose

To describe inspection procedures to:

  • ensure compliance of earlier checks
  • check the documentation
  • assess the quality of training and
  • overall performance of training centres

Reference to guidelines

Para 3.2.1.7, page 23

Prerequisite/s                  

Access to completed:

Time for completion                  

As per the inspection schedule

Resource/s

SF 5.2A: Training centre inspection and as per the SFs listed after the activities table below

Process owner

PIA OP team

Activities

Actor

Action

Time for completion

Relevant documents

PIA OP team

To ensure

  • Availability of all recordsas per list given in due diligence and information about the activities to be carried out at the centre on ERP
  • Proper functioning of the training centre

Duration varies as per each activity and time for completion is shown against the activity

 

SF 5.2A: Training centre inspection and as per forms listed in due diligence list.

PIA Q team

carry out the inspection as detailed in SF 5.2A

Share inspection report and advisories with SRLM/CTSA

Follow up for compliance

As per the inspection schedule

SF 5.2A 

For APS

SRLM

  • Carry out the inspection as detailed in SF 5.2A
  • To verify randomly selected items verified by PIA Q team including the inspection notes and compliance of the PIAs Q team
  • Share inspection report and advisories with PIA for compliance and CTSA for information

As per the inspection schedule

Within 3 days of conduct of inspection

SF 5.2A

CTSA

  • Carry out the inspection as detailed in SF: 5.2A
  • Check on Q team and SRLM reports and share the advisories
  • Share inspection report and advisories with PIA for compliance and SRLM to ensure

As per the inspection schedule

 

 

Within 3 days of conduct of inspection

 SF 5.2A

PIA OP team

  • Comply with the advisories shared

Within 5 days of receipt of advisories

SF 5.2A

PIA Q team
  • Ensure compliance of the advisories
Within 8 days of receipt of advisories SF 5.2A
SRLM
  • Verify compliance report of PIA Q team and initiate action as per default procedure and report CTSA
As per the schedule prescribed in Default chapter SF 5.2A

For YPS

CTSA

  • Carry out the inspection as detailed in SF: 5.2A
  • To verify randomly selected items verified by PIA Q team including the inspection notes and compliance of the PIAs Q team
  • Share inspection report and advisories with PIA for compliance and SRLM for information

As per the inspection schedule but not later than 3 days of inspection conducted

 

Within 3 days of conduct of inspection

SF 5.2A

5.2.1     Protocol for inspection of a training centre

All training centres will be inspected by persons trained in DDU-GKY processes. In emergencies if inspections are done by SRLM/CTSA/MoRD personnel not trained in DDU-GKY processes the same should be reviewed and ratified by personnel trained in DDU-GKY.

(If the centre does not run throughout the year, the number of inspections will be reduced proportionately but there should be at least one inspection by Q team in a year).

5.2.1.1     Deleted

Content of the section is deleted, however the section is retained to maintain the number continuity

5.2.1.2     PIA Q team

5.2.1.3     SRLM (or its TSA) for APS/CTSA for YPS

5.2.1.4     CTSA (for APS and YPS)

5.2.1.5     Role of SRLMs in YPS

SRLM in an YPS can play an active role in ensuring quality of the programme. However, as SRLM team is not strengthened no schedules are prescribed for their inspections. Depending on the staff availability, SRLM is encouraged to get its personnel trained in DDU-GKY procedures and to enable monitoring by its team.

All inspection reports of SRLM of YPS should be sent to CTSA, PIA and MoRD. It is the responsibility of the PIA to comply with items and send a compliance report through the PIA Q team to SRLM and CTSA. CTSA will monitor and ensure proper compliance.

5.2.2     Protocol for CCTV

Overview

Item

Description

Purpose

To ensure that a training centre performs as per procedures in guidelines and the SOP by review of CCTV footage

Reference to Guidelines

Para 3.2.2.2.1, page 27

Prerequisite/s                   

Start of training centre

Time for completion                  

Continuous process when the training is going on

Resource/s

As per SF 5.2B: CCTV - Specifications, location and recording, review and storage

Process owner

PIA OP team

Activities

Actor

Action

Time for completion

Relevant documents

PIA OP team

  • To ensure that the daily activities are being captured through CCTV.
  • Storage of video footage after completion of each batch and share whenever is asked for

Daily

SF 5.2B: CCTV - Specifications, location and recording, review and storage

To review CCTV footage as per the instruction given in SF 5.2A: Training centre inspection

As per the inspection schedule

SF 5.2B

For APS

SRLM

  • To review CCTV footage as per the instruction given in SF 5.2A: Training centre inspection
  • To verify randomly generated samples verified by PIA Q team including the inspection notes and compliance of the PIAs Q team

As per the inspection schedule

SF 5.2B

CTSA

Check on Q team and SRLM reports

As per the inspection schedule

SF 5.2B

For YPS

CTSA

  • To review CCTV footage as per the instructions given in SF 5.2A: Training centre inspection
  • To verify randomly generated samples verified by PIA Q team including the inspection notes and compliance of the PIAs Q team
  • Follow up on compliance of SRLM’s observations.

As per the inspection schedule

SF 5.2B

To know more about Centre Inspections to watch the video

5.3. Protocol for uniform distribution

Overview

Item

Description

Reference to guidelines

Row 11, sl no. 5, table 1, para 3.2.2.4, page 32

Prerequisite                    

Freezing of batch

Purpose

To generate a distinct identity and a sense oneness amongst the candidates

Time for completion                  

To be distributed with the welcome kit

Resources

As per SF 5.3A:Specifications for uniform and SF 5.1K: Checklist of items given to candidates

Process owner

PIA OP team

Activities

Actor

Action

Time for completion

Relevant documents

PIA op team

  • To distribute uniform to candidates
  • Maintain the record of distribution of uniform

Measurements: At the time of batch freezing

Distribution: Along with welcome kit

SF 5.3A:Specifications for uniform

SF 5.1K: Checklist of items given to candidates

PIA Q team

  • Verification during training centre inspection visit as per randomly selected candidates
  • Review of CCTV footage

As per the inspection schedule

SF 5.2A training centre inspection

For APS

SRLM

  • Verification during training centre inspection visit as per randomly selected candidates
  • Review of CCTV footage
  • To verify randomly selected candidates verified by Q team

As per the inspection schedule

SF 5.2A training centre inspection

CTSA

Check on Q team and SRLM reports

 

 

For YPS

CTSA

  • Verification during training centre inspection visit as per randomly selected candidates
  • Review of CCTV footage
  • To verify randomly selected candidates verified by Q team
  • Follow up on compliance of SRLM’s observations.

As per the inspection schedule

SF 5.2A training centre inspection

5.4. Assessment and certification of candidates

This section is deleted and moved to section 4.7: Outline of assessment and certification in Chapter 4.

5.5. Conducting training outside a state

Earlier sections prescribe checks to be done by an SRLM/CTSA within the state geographical boundaries. In a project while the prospective candidates should be residents of the state to which the project is sanctioned, the training of the candidates can be imparted anywhere in the country. The following steps should be followed if a training centre is outside the state to which the project is assigned:

Agency to monitor the training would be as follows:

5.6. List of Standard Forms in chapter 5

SF 5.1A1: Look and feel of a training centre

SF 5.1A2: Training centre name board

SF 5.1A3: Hostel centre name board

SF 5.1B1: Activity summary and achievement board

SF 5.1B2: Contact details of important people

SF 5.1B3: Basic Information Board (Training Centre)

SF 5.1B4: Basic Information Board (Residential Centre)

SF 5.1B5: Academic Information Board

SF 5.1B6: Living Area Information Board

SF 5.1B7: Code of conduct for candidates

SF 5.1B8: Food specifications (residential centre)

SF 5.1C1: Student entitlement board and responsibilities board

SF 5.1C1A: Student Attendance and To and Fro Entitlement Summary Information Board

SF 5.1C2: Welcome kit to trainees

SF 5.1C3: First-aid kit

SF 5.1 D1: Due diligence of a training centre (excluding residential facilities)

SF 5.1D2: Due diligence for residential facilities

SF 5.1D3: List of equipments should be carried for due diligence of training centre/ residential facilities

SF 5.1E1: Summary of staff deployed at the training centre

SF 5.1E2: Trainers’ profile

SF 5.1F: Candidate ID template

SF 5.1G1: Index of individual candidate dossier

SF 5.1G2: Parents’ consent form

SF 5.1H1: Batch summary as on day of batch freezing

SF 5.1H2: List of candidates in the batch and their profile

SF 5.1I: Attendance registers for candidates (as per biometric device)

SF 5.1J: Attendance registers for trainers (as per biometric device)

SF 5.1K: Checklist of items given to candidates

SF 5.1L1: Candidate feedback form

SF 5.1L2: Summary of the feedback given by the candidates in SF 5.1L1: On completion of training programme

SF 5.1M: Summary of evaluation and assessment done

SF 5.1N: TA/ DA calculation record (batch wise) – To be linked with biometric attendance

SF 5.1O1: Training certificate

SF 5.1O2: Training completion certificate distribution record

SF 5.1P: List of equipment in the training centre

SF 5.1Q: List of equipment available in the trainees’ accommodation facilities (applicable for residential training only)

SF 5.1R: Instructions for opening and running hybrid training centres and introducing multiple shifts and double shift batches in a training centre

Definitions

SF 5.1S: Bare minimum items to be ensured to start training pending CTSA/ SRLM due diligence visit

SF 5.1T: Daily failure items report

SF 5.1U: 15 day summary of centre status

SF 5.2A: Training centre verification and inspection

SF 5.3A: Specification of uniform