Overview
Item |
Description |
Purpose |
To create an aggregate hourly plan for domain and non-domain skills and their distribution between class room and on the job training which totals to the mandated number of hours. The training in non-domain should be allocated between PIAs normal training centre and finishing and work readiness centres located at the places of concentrated high employment[1]. |
Reference to guidelines |
No specific provision |
Prerequisite |
Any time after uploading of Sanction order (I2) and 15 days before commencement of training in the particular trade |
Time for completion |
15 days before commencement of training in the particular trade |
Resource/s |
As per SF 4.1A: Plan of training |
Process owner/s: |
PIA OP team |
Activities
Actor |
Action |
Time for completion |
Relevant Documents |
PIA OP team |
To submit aggregate plan of hourly distribution of training, giving break up of domain and non-domain skills spread over class room and on the job training |
To be submitted 15 days before commencement of the training in the trade |
|
PIA Q team |
Verify and certify that the course content is uploaded at the web site for all domains |
Verified within 3 days and issue compliance |
|
For APS |
|||
SRLM |
Verify and certify that the course content is uploaded at the web site |
Within 7 working days of receipt of information |
|
For YPS |
|||
CTSA |
Verify and certify that the course content is uploaded at the web site. |
Within 7 working days of receipt ofinformation |
|
Overview
Item |
Description |
Purpose |
To ensure that the domain curriculum is:
|
Reference to guidelines |
|
Prerequisite |
Any time after uploading of Sanction order (I2) and 15 days before commencement of training in the particular trade |
Time for completion |
15 days before commencement of training in the particular trade |
Process owner: |
PIA OP team |
Activities
Actor |
Action |
Time for completion |
Relevant Documents |
PIA OP team |
To submit an approved course plan as per procedures followed by NCVT/SSC |
To be submitted 15 days before commencement of training program
|
|
PIA Q team |
Verify and certify that the course content is uploaded at the web site for all domains |
Verified within 3 days and issue compliance |
|
|
|
|
|
For APS |
|||
SRLM |
Verify and certify that the 3rd party certified course content is uploaded at the web site for all domains |
Within 7 working days from the time programme is uploaded |
|
For YPS |
|||
CTSA |
Verify and certify that the 3rd party certified course content is uploaded at the web site for all domains |
Within 7 working days from the time programme is uploaded |
|
Overview
Item |
Description |
Purpose |
To develop enforceable standards for curriculum for Soft skills, Computer skills and English skills |
Reference to guidelines |
|
Prerequisite |
Any time after uploading of Sanction order (I2) and 15 days before commencement of first training |
Time for completion |
15 days before commencement of training in the particular trade |
As per SF 4.3A: English skills content, SF 4.3B: Computer skills content and SF 4.3C: Soft skills content |
|
Process owner: |
PIA OP team |
Activities
Actor |
Action |
Time for completion |
Relevant Documents |
PIA OP team |
To submit a course plan as per standards prescribed by DDU-GKY for English, Computer and Soft skills |
To be submitted 15 days before commencement of training program |
SF 4.3A: English skills content, SF 4.3B: Computer skills content and SF 4.3C: Soft skills content |
PIA Q team |
Verify and certify that the course content is uploaded at the web site for all domains. |
Verified within 3 days and issue compliance |
|
For APS |
|
|
|
SRLM |
Verify and certify that the course content is uploaded at the web site for all domains. |
Within 7 working days of receipt of information. |
|
For YPS |
|||
CTSA |
Verify and certify that the course content is uploaded at the web site for all domains. |
Within 7 working days of receipt of information. |
|
Overview
Item |
Description |
Purpose |
To ensure high rate of success in placement and retention |
Reference to guidelines |
|
Prerequisite |
Any time after uploading of Sanction order (I2) and 15 days before start of training. |
Time for completion |
15 days before start of first training |
Process owner: |
PIA OP team |
Activities
Actor |
Action |
Time for completion |
Relevant Documents |
PIA OP team |
To submit a course plan as per standards prescribed by DDU-GKY for finishing and work readiness curriculum content |
To be submitted 15 days before commencement of training program. |
|
PIA Q team |
|
Verified within 3 days and issue compliance |
|
For APS |
|
|
|
SRLM |
|
Within 7 working days of receipt of information. |
|
For YPS |
|||
CTSA |
|
Within 7 working days of receipt of information. |
|
Overview
Item |
Description |
Purpose |
Daily activity plan for entire course duration including class room and on the job training |
Reference to guidelines |
No specific provision |
Prerequisite |
Any time after uploading of Sanction order (I2) and 15 days before commencement of training in the particular trade |
Time for completion |
15 days before commencement of training in the particular trade |
Process owner: |
PIA OP team |
Activities
Actor |
Action |
Time for completion |
Relevant Documents |
PIA op team |
To submit activity cum lesson planner |
15 days before commencement of the training programme |
|
PIA Q team |
Verify and certify that the course content is uploaded at the web site for all domains. |
Verified within 3 days and issue compliance |
|
For APS |
|||
SRLM |
Verify and certify that the course content is uploaded at the web site for all domains. |
Within 7 working days of receipt of information. |
|
For YPS |
|||
CTSA |
Verify and certify that the course content is uploaded at the web site for all domains. |
Within 7 working days of receipt of information. |
|
Overview
Item |
Description |
Purpose |
To acclimatise a trainee to actual job conditions |
Reference to guidelines |
Para 3.2.2.4, page 29 |
Prerequisite |
Should be part of the activity cum lesson planner for the domain. Candidate should have completed the class room training as per activity cum lesson planner |
Time for completion |
Before placements |
SF 4.6A: On the job training plan for the batch, SF 4.6B: On the job training confirmation letter for candidates, SF 4.6C: OJT completion certificate for candidates and SF 4.6D: Verification for OJT |
|
Process owner: |
PIA OP team |
Activities
Actor |
Action |
Time for completion |
Relevant Documents |
PIA OP Team |
|
|
SF 4.6A: On the job training plan for the batch, SF 4.6B: On the job training confirmation letter for candidates, SF 4.6C: OJT completion certificate for candidates |
PIA Q Team |
|
Start inspections after 4 days of joining OJT |
|
For APS |
|||
SRLM |
|
To verify that the PIA has uploaded the programme correctly. |
|
For YPS |
|||
CTSA |
|
To verify that the PIA has uploaded the programme correctly. |
PIA will have to conduct internal and external assessment of the candidates The process for internal and external assessment and certification are detailed below:
Overview
Item |
Description |
Purpose |
Outline procedures for internal assessment and course completion certification of candidates |
Reference to Guidelines |
Para 3.2.2.2.3, page 29 |
Prerequisite/s |
Admission of a candidate to a batch |
Time for completion |
Continuous during the training |
Resource/s |
SF 4.7A: Common instruction for Internal and external assessment; certification of candidates and SF 4.7A1: Formative assessment of candidate |
Process owner |
PIA OP team |
Activities
Actor |
Action |
Time for completion |
Relevant Documents |
|
PIA OP team |
|
To be done continuously At the end of each batch |
SF 4.7A: Common instruction for Internal and external assessment; certification of candidates |
|
Trainers of PIA |
|
Every fortnight |
SF 4.7A1: Formative assessment of candidate |
|
PIA Q team/Academic committee of PIA |
Internal assessments: Verify
|
As per inspection schedule. For internal assessments - Check randomly selected candidates and randomly selected videos during a centre visit. Inspect videos of assessment process on the first visit after the batch is trained. |
SF 4.7A and 5.2A: Training centre inspection SF 4.7A1 |
|
For APS |
||||
SRLM |
|
As per inspection schedule . |
SF 4.7A and 5.2A SF 4.7A1 |
|
CTSA |
|
As per inspection schedule |
SF 4.7A and 5.2A SF 4.7A1 |
|
For YPS |
||||
CTSA |
Same checks as Q team but on a different set of randomly selected candidates. In addition, check one randomly selected candidate from amongst the candidates verified by the Q team. Verify formative assessment report of the candidates |
As per inspection schedule . |
SF 4.7A and 5.2A SF 4.7A1 |
|
SRLM |
|
As per inspection schedule . |
SF 4.7A and 5.2A SF 4.7A1 |
Overview
Item |
Description |
Purpose |
To ensure Accreditation and affiliation of center External assessment and certification of candidates by National Council for Vocational Training (NCVT) and Sector Skill Council (SSC) |
Reference to guidelines |
Point ii, Para 3.2.2.2.6, Page no. 30 |
Prerequisite/s |
Any time after uploading of sanction order (I2) |
Time for completion |
External assessment: Assessment to be done in the last ten days of training by an agency accredited by NCVT/SSC |
Resource/s |
SF 4.7A: Common instruction for Internal and external assessment; certification of candidates, SF: 4.7B: Instructions for online application for accreditation and affiliation (SSC) / testing centre (NCVT) and SF 4.7C: External assessment certificate report |
Process owner |
PIA OP team |
Activities
Actor |
Action |
Time for completion |
Relevant documents |
Accreditation and affiliation for training centres based on course[1] for SSC/NCVT |
|||
PIA |
For SSC Apply for accreditation of training centre for a job role to NSDC/SSC on the designated web link Obtain affiliation from SSC For NCVT Application for Testing centre to concerned RDAT Obtain approval of testing centre |
Before due diligence of the centre for a trade By uploading training centre information on the ERP (Normally it takes almost 30 days to complete the affiliation) Within 3 days of due diligence approval by SRLM /CTSA Within 10 days of application |
SF: 4.7B: Instructions for online application for accreditation and affiliation (SSC) / testing centre (NCVT) |
External Assessment of candidates (applicable for both SSC and NCVT trades) |
|||
PIA OP team |
Apply with complete details of a batch to be assessed along with payment for assessment fee to SSC/NCVT and proof of payment to be uploaded on ERP Obtain confirmation about assessment date and logistics required to conduct assessment and assessment date to be uploaded on ERP Conduct assessment through SSC/NCVT empanelled assessor To ensure capture and storage of complete assessment of each batch |
Within 5 days of batch freezing Within 10 days before the date of assessment Assessment has to be done within 10 days of completion of batch (If candidates have OJT PIA has an option to complete the assessment either before or after the OJT. This should be indicated in the lesson planner). As per the assessment |
SF: 4.7B: Instructions for online application for accreditation and affiliation (SSC) / testing centre (NCVT) SF 5.2B: CCTV - Specifications, location and recording, review and storage of chapter 5 |
PIA Q Team |
To review CCTV footages of assessment as per the instruction given in SF 5.2A: Training centre inspection |
As per the inspection schedule |
SF 5.2B: CCTV - Specifications, location and recording, review and storage of chapter 5 |
SRLM/CTSA |
To review CCTV footages of assessment as per the instruction given in SF 5.2A: Training centre inspection |
As per the inspection schedule |
SF 5.2B CCTV - Specifications, location and recording, review and storage of chapter 5 |
Certification of candidate (applicable for both SSC and NCVT) |
|||
SSC/NCVT |
Upload the result in their own website or share the information with PIA Assessment Certificates to be issued to the PIA |
Within 10 days of assessment completion of a batch Within 45 days from completion of assessment |
SF 4.7C: External assessment certificate report |
PIA OP team |
Upload certificate details on ERP and distribute certificate to the candidates |
Within 7 days of receipt of certificate |
SF 4.7C: External assessment certificate report |
PIA Q team |
Verify complete certificate details updated for the candidates on ERP |
As per the inspection schedule |
SF 4.7C: External assessment certificate report |
SRLM for APS and CTSA for YPS |
Cross-verify Q team report with certificate details updated for the candidates on ERP |
As per the inspection schedule |
SF 4.7C: External assessment certificate report |
CTSA for APS |
Cross-verify SRLM report on with certificate details updated for the candidates on ERP |
As per the inspection schedule |
SF 4.7C: External assessment certificate report |
Note: * If certificate is not issued by SSC/NCVT within 45 days from completion of assessment, PIA has to escalate the issue to SRLM at State level and MoRD at central level. All delays will be consolidated and taken up with SSC/NCVT. |
[1] Course is the primary trade in which the candidates will be certified. A centre has to be accredited and affiliated under the primary trade.
Overview
Item |
Description |
Purpose |
To increase the interest among candidates towards self-learning modules |
Reference to guidelines |
|
Prerequisite |
Should be part of approved application form |
Time for completion |
Continuous process |
SF 4.8A: Daily distribution of Tablets and SF 5.2A: Training centre inspection form and SI 8.7A: Procedures for procurement, accounting, distribution and disposal of tablet computers of chapter 8 |
|
Process owner |
PIA OP team |
Activities
Actor |
Action |
Time for completion |
Relevant Documents |
PIA OP Team |
|
Before start of training Daily Daily |
SF 4.8A: Daily distribution of Tablet computers, SF 5.1D1:Due diligence of a training centre SF 5.2A: Training centre inspection form and SI 8.7A: Procedures for procurement, accounting, distribution and disposal of tablet computers of chapter 8 SF 4.8A, SF 5.2A and SI 8.7A SF 4.8A, and SI 8.7A |
PIA Q Team |
|
As per inspection schedule |
SF 5.1D1 and SF 5.2A |
For APS |
|||
SRLM/CTSA |
|
As per the inspection schedule |
SF 5.1D1 and SF 5.2A |
Overview
Item |
Description |
Purpose |
To train candidates in topics that are difficult to teachby developing good quality course content that can be standardized and replicated |
Reference to guidelines |
|
Prerequisite |
Should be part of approved application form and the activity cum lesson planner for the domain |
Time for completion |
As per the activity cum lesson planner |
Process owner |
PIA OP team |
Activities
Actor |
Action |
Time for completion |
Relevant Documents |
PIA OP Team |
|
Daily |
|
PIA Q Team |
|
As per the inspection schedule |
|
For APS |
|||
SRLM |
Check and verify as per requirement. |
As per the inspection schedule |
|
For YPS |
|||
CTSA |
|
As per the inspection schedule |
SF 4.2A: Domain curriculum content and equipment
SF 4.3A: English skills content
SF 4.3B: Computer skill content
SF 4.4A: Finishing and work readiness module
SF 4.5A: Activity cum lesson planner
SF 4.6A: On the job training plan for the batch
SF4.6B: On the job training confirmation letter for candidates
SF 4.6C: OJT completion certificate for candidates
SF 4.7A: Common instruction for Internal and external assessment; certification of candidates
SF 4.7A1: Formative assessment of candidate
SF: 4.7B: Instructions for online application for accreditation and affiliation (SSC) / testing centre (NCVT)
SF 4.7C: External assessment certificate report