Overview
Item |
Description |
Purpose |
To ensure that all the DDU-GKY training centres across India have distinctive look |
Reference to Guidelines |
|
Prerequisite/s |
After signing of MoU and locating training centre. |
Time for completion |
As per training plan |
Resource/s |
SF 5.1A1: Look and feel of a training centre, SF 5.1A2: Training centre name board, SF 5.1A3: Hostel centre name board, SF 5.1B1: Activity summary and achievement board, SF 5.1B2: Contact details of important people, SF 5.1B3: Basic Information Board (Training Centre), SF 5.1B4: Basic Information Board (Residential Centre), SF 5.1B5: Academic Information Board, SF 5.1B6: Living Area Information Board, SF 5.1B7: Code of conduct for candidates, SF 5.1B8: Food menu (residential centre), SF 5.1C1: Student entitlement board and responsibilities board, SF 5.1C1 A: Student Attendance and Entitlement Summary Information Board |
Process owner |
PIA OP team |
Activities
Overview
Item |
Description |
Purpose |
To verify availability of minimum infrastructure before a training centre opens |
Reference to Guidelines |
|
Prerequisite/s |
Signing of MoU. Training, however, can only start after PER approval. |
Time for completion |
Due diligence is required before:
|
Resources/s |
SF 5.1D1: Due diligence of training centre (excluding residential facilities), SF 5.1D2: Due diligence of residential facilities and all the forms mentioned in SF 5.1D1 and SF 5.1D2, SF 5.1S: Bare minimum items to be ensured to start training pending CTSA/ SRLM due diligence visit |
Process owner |
CTSA for YPS/SRLM for APS |
Activities
Actor |
Action |
Time for completion |
Relevant documents |
PIA OP Team |
|
As per training plan |
SF 5.1D1: Due diligence of training centre (excluding residential facilities), SF 5.1D2: Due diligence of residential facilities SF 5.1S: Bare minimum items to be ensured to start training pending CTSA/ SRLM due diligence visit |
PIA Q team |
As per training plan |
||
For APS |
|||
SRLM |
|
Within 10 working days of receipt of information from PIA Q team If the above is not possible due diligence should be done within 20 working days of start of training. Delaying it will impact the performance grading of the SRLM |
|
CTSA |
|
As per inspection schedule |
|
For YPS |
|||
CTSA |
|
Within 10 working days of receipt of information from PIA Q team If the above is not possible it should be done within 20 working days of start of training Delaying it will impact the performance grading of the CTSA. |
To know more about Due Diligence to watch the video
Overview
Item |
Description |
Purpose |
To lay down procedures for opening and running hybrid training centres. |
Reference to guidelines |
No specific reference |
Prerequisite/s |
Any time after signing of MoU |
Time for completion |
As per due diligence process |
Resource/s |
|
Process owner |
SRLM for APS/CTSA for anYPS |
Activities
Actor |
Action |
Time for completion |
Relevant Documents |
||
PIA OP team |
To ensure the following: |
As per training plan |
|||
PIA Q team |
|
As per training plan |
|||
For APS |
|||||
SRLM |
|
As per due diligence process |
|||
For YPS |
|||||
CTSA |
|
As per due diligence process |
|||
Overview
Item |
Description |
Purpose |
To lay down procedures for introducing multiple shifts and double shift batches in a centre. |
Reference to guidelines |
No specific reference |
Prerequisite/s |
Training centres where due diligence is approved |
Time for completion |
5 working days in advance of commencement of training |
Resource/s |
|
Process owner |
PIA OP team |
Activities
Actor |
Action |
Time for completion |
Relevant Documents |
||
PIA OP team |
|
As per training plan at the centre |
|||
PIA Q team |
|
At least 5 working days in advance of commencement of training |
|||
For APS |
|||||
SRLM |
|
As per the inspection schedule |
|||
For YPS |
|||||
CTSA |
|
As per the inspection schedule |
|||
If a PIA plans to introduce multiple shifts and/or double shift batches in a training centre at the time of due diligence all the timelines prescribed in due diligence will be applicable. |
|||||
Overview
Item |
Description |
Purpose |
To ensure proper functioning of training centre and capture details of non-functional equipment, trainer and trainee attendance, and deviations if any from the notified training plan |
Reference to Guidelines |
No specific reference |
Prerequisite/s |
Filing due diligence report by PIA Q team |
Time for completion |
On all days when the trainings are scheduled in the centre |
Resource/s |
SF 5.1T: Daily failure items report and SF 5.1U: 15 day summary of centre status |
Process owner |
PIA OP team |
Activities
Actor |
Action |
Time for completion |
Relevant documents |
PIA OP team |
|
Daily when the centre opens Summarise by 16th of the month for first fortnight and by 1st of next month for the second fortnight and the complete month |
Daily report as per SF 5.1T: Daily failure items report Summary as per |
PIA Q team |
i) daily entry of data and ii) trend of failures
|
Fortnightly and monthly review As per the inspection schedule |
SF 5.1T and |
For APS |
|||
SRLM |
|
Fortnightly and monthly review As per the inspection schedule |
SF 5.1T and |
CTSA |
|
Fortnightly and monthly review As per the inspection schedule |
|
For YPS |
|||
CTSA |
|
Fortnightly and monthly review As per the inspection schedule |
SF 5.1T and |