Placement as defined in the guidelines is operationalized in SF 7.2A: Placement and related definitions. This will be the guiding basis to decide whether a candidate is placed or not. Using these definitions as basis, list of candidates for physical verification will be generated as SF 7.2C1: List of candidates from where samples for physical verification are to be drawn.
7.2.1 Generation of samples for physical verification
The sampling process and the decision rules for judging the payment to be released in all three instalments (other than 1st) are given in SF 7.2C: Procedure to draw samples for physical verification and confirmation of placement. The process will be used to draw samples every month and the process of the verification is described in the next Section.
Note: The sample once generated cannot be changed under any circumstance and they are stored in a secure place in the repository of the ERP system.
7.2.2 Monthly sample physical verification
Overview
Item |
Description |
Purpose |
To physically verify a sample of candidates who meet the placement criteria at the end of previous month |
Reference to guidelines |
Section 4.8 page 51 |
Prerequisite/s |
Submission of list of candidates deemed as placed after document verification |
Time for completion |
Continuous process |
Resource/s |
SF7.2D: Items to be checked during on-site visit for placement verification, SF 7.2E: Status of candidates after physical verification of placement, SF 7.2C: Procedure to draw samples for physical verification and confirmation of placement and SF 7.2C1: List of candidates from where samples for physical verification are to be drawn |
Process owner |
CTSA for YPS/SRLM for APS |
Activities
Actor |
Action |
Time for completion |
Relevant Documents |
Physical verification |
|||
PIA Q team |
Physical verification of placed candidates |
To be done between 16th to 20th of the month |
SF 7.2C1: List of candidates from where samples for physical verification are to be drawn, SF7.2D: Items to be checked during on-site visit for placement verification |
SRLM for APS and CTSA for YPS |
Physical verification of placement: Primary and recheck |
To be done between 21st to 26th of month – As per sampling process |
SF 7.2C1: List of candidates from where samples for physical verification are to be drawn, SF7.2D: Items to be checked during on-site visit for placement verification |
Finalisation of placement in the month |
|||
SRLM for APS and CTSA for YPS |
Analyse document verification and physical verification records of that month and conclude number of candidates placed in that month |
27th to last day of the month |
SF 7.2E: Status of candidates after physical verification of placement |
PIA OP team |
To raise any objections or seek clarifications on the summary report of placement submitted by the SRLM for APS and CTSA for YPS. |
1st to 5th of next month |
SF 7.2E: Status of candidates after physical verification of placement |
SRLM for APS and CTSA for YPS |
To finally decide the status of candidate after considering the Ops team’s objections. |
6th to 10th of next month |
SF 7.2E: Status of candidates after physical verification of placement |
7.2.2.1 Mechanism for resolving differences over sampling results
If any differences arise during placement verification, the process for resolving them is as follows:
7.2.3 Finalising placement percentage and release of Instalments
To release an instalment, the following will be followed:
The process will be repeated for all instalments.